| Requirements |
Description |
| Permission
to Tap (PTT) Application |
- Customer/Contractor
shall submit PTT application.
- Proposed
drawing attached with existing line size, name, station numbers and elevations.
|
Utility
Right-of-Way Agreement
(NTUA
form 5447) |
- Grants
NTUA access to property to conduct surveys, construct, operate and maintain
services as requested by you.
- At this
time homesite leases will be verified.
|
| NTUA
Approval Process (PTT) |
- Departments:
__ Water Foreman __ Field Supervisor __ HQ Engineering
- Approval
date: ____/____/____
|
Service
Application
(NTUA
form 5412) |
- Name,
location, description of dwelling, service requesting, rural address, as
well as a map or sketches of the service location are all part of this
application.
|
| Customer
Contribution |
- Payment
arrangement is established and contracts signed.
|
| Security
Deposit Required |
|
| Fees
Required |
- Establishment
= $10.00 per Utility.
|
| Tap
Inspection Scheduled |
__ Approved
__ Disapproved - Tap re-inspection will be scheduled.
|
| Final
Inspection |
Customer/Contractor
should be informed that as-built, cost of plant and utility transfer agreement
needs to be completed and ready for on-site inspection.
__Pass
__ Disapproved (Final re-inspection will be scheduled).
|
| Final
Inspection of Installed Facilities |
- __ Approved
__Disapproved
- Meter
Installation Date: ____/____/____
|