| Requirements |
Description |
| Permission to Tap (PTT)
Application |
- Customer/Contractor shall submit
PTT application.
- Proposed drawing attached with
existing line size, name, station numbers and elevations.
|
Utility Right-of-Way Agreement
(NTUA form 5447) |
- Grants NTUA access to property
to conduct surveys, construct, operate and maintain services as requested
by you.
- At this time homesite leases
will be verified.
|
| NTUA Approval Process (PTT) |
- Departments: __ Water Foreman
__ Field Supervisor __ HQ Engineering
- Approval Date: ___/___/___
|
Service Application
(NTUA form 5412) |
- Name, location, description
of dwelling, service requesting, rural address, as well as a map or sketch
of the service location are all part of this application.
|
| Customer Contribution |
- Payment arrangement is established
and contracts signed.
|
| Security Deposit Required |
|
| Fees Required |
- Establishment = $10.00 per Utility
- Bacti = $47.00
- Pressure Test = $75.00 (if required)
|
| Tap Inspection Scheduled |
__ Approved __ Disapproved -
Tap re-inspection will be scheduled.
|
| Bacti Sample Scheduled |
__ Pass __ Failed - re-sampling
will be scheduled (@$47.00 per sample).
|
| Final Inspection |
- Customer/Contractor should be
informed that as-built, cost of plant and utility transfer agreement needs
to be completed and ready for on-site inspection.
- __Pass __ Disapproved (Final
re-inspection will be scheduled).
|
| Final Inspection of Installed
Facilities |
- __ Approved __Disapproved
- Meter Installation Date:____/____/____
|