Navajo Tribal Utility Authority®

On October 26th, NTUA hosted a Job Fair for the planned Red Mesa Solar project. It was a one-day event. We were going to pitch a large event tent; however, the strong winds yesterday quashed that idea. In following safe distancing protocol, the field crews then suggested we turn it into a ‘drive-thru’ job fair. It worked out much better than expected. Photos are attached of the event outside the NTUA Red Mesa Sub-office. Over 300 people submitted applications.

 

We understand that the harsh weather conditions may have cancelled some plans to attend. If you are interested in applying, you may download the attached application. Please send to ntuapr@ntua.com. We will make sure it gets to the right place.

 

Construction on the project is expected to get underway in February 2022. The project is anticipated to bring up to 250 jobs to the area during the peak of the construction.

Navajo Tribal Utility Authority • P.O. Box 170, Fort Defiance, AZ 86504 • Phone: (928) 729-5721 • 1-800-528-5011 Copyright © 2021 NTUA - A proud Enterprise of the Navajo Nation